#1. Given:- Unit 1 tripped from full power following a 200 day run.- The crew has transitioned to 1BwEP ES-0.1, REACTOR TRIP RESPONSE.- ALL RCPs are running.- RCS pressure is 2125 psig and stable.- RCS temperature is 552F and stable.- DRPI indication for 4 rods indicates 18 steps.- DRPI indication for 1 rod indicates 6 steps.- ALL other rods ROD AT BOTTOM lights are lit.The crew is required to emergency borate a MINIMUM of(1BwEP ES-0.1, page 7 is attached)
#2. Given:- Unit 2 is at 100% power.- All systems are normally aligned.- RCS pressure is 1810 psig and lowering rapidly.- Pressurizer level is 72% and rising rapidly.- PRT temperature, pressure and level are rising.Based on the above indications, the operators FIRST action is to
#3. Given:- Unit 1 is at 100% power.- The crew placed excess letdown in service one hour ago in conjunction withnormal letdown.- 1CV8143, Excess Letdown to Seal Filter or RCDT Valve, is in the VCT position.- The following indications are noted by the crew: – VCT level is slowly lowering. – ALL RCP seal injection flows have been stable for the past 55 minutes. – ALL RCP seal return flows have been stable for the past 55 minutes. – CC surge tank level has been rising slowly for the past 15 minutes. – CC surge tank level is currently 76%. – 1PR09J, Unit 1 CC Heat Exchanger Rad Monitor, is in ALERT.Based on the above indications, a leak has developed in which of the following heatexchangers?
#4. Given:- Unit 1 was at 100% power.- All systems are normally aligned.- A large RCS LOCA occurred.- All systems functioned as designed.- The operating crew implemented 1BwEP-0, REACTOR TRIP OR SAFETYINJECTION, and transitioned to 1BwEP ES-1.3, TRANSFER TO COLD LEGRECIRCULATION, due to RWST level.- The crew has completed aligning CV and SI pump suction from the RH pumpsand is preparing to align the CS pumps for recirculation with the followingindications.- RWST level is 15%.- CS is NOT reset.- SI is reset.- ALL CV, SI, RH, and CS pumps are running.- A loss of offsite power occurs.- BOTH DG output breakers have just closed.Based on the above indications, the operators FIRST action is to
#5. Given:- A small break RCS LOCA occurred on Unit 1.- Due to ECCS equipment failures, the crew has entered 1BwFR-C.1,RESPONSE TO INADEQUATE CORE COOLING.- ALL RCPs are secured.- The crew is preparing to start RCPs with the following conditions: – CETCs = 1324F. – RCS pressure = 580 psig. – ALL SG levels are adequate to support RCP operation. – NO CC pumps running or available. – ALL 6.9 KV buses are energized.Based on the above conditions, an RCP will
#6. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- PZR level is at 60%.- 1A CV pump is running.- 1CV121, Centrifugal Charging Pump Flow Control Valve, is in MANUAL control.- Charging flow is 132 gpm.- 1CV182, Charging Header Back Pressure Control Valve, is at 52% demand.- Seal injection flows are 11 gpm per RCP.- 1A CV pump impeller begins to slowly degrade.In order to maintain pressurizer level at 60% AND RCP seal injection flows at 11 gpm, theoperators must
#7. Given:- A large break RCS LOCA occurred on Unit 1.- The operating crew has aligned both trains of ECCS and CS for cold legrecirculation per 1BwEP ES-1.3, TRANSFER TO COLD LEG RECIRCULATION.- Containment floor water level = 35.- Three containment sump lights are lit on each train.- ALL ECCS pump parameters are stable.- RWST level = 5%.The crew transitions to 1BwCA-1.3, SUMP BLOCKAGE CONTROL ROOM GUIDELINE.Which of the following actions will the crew perform FIRST?
#8. Given:- Unit 1 is in Mode 1 at 100% power.- 1A CC Pump is running.- 0 CC Pump is aligned to Bus 142.- 0 CC Pump Bus 142 C/S is in NAT.- 0 CC Hx is aligned to Unit 1.- 1TK-130, Letdown Heat Exchanger Outlet Temperature Controller, is inMANUAL at 55% demand.- Annunciator 1-2-B5, CC Pump Discharge Pressure Low, is in alarm.- 1B CC Pump automatically started and immediately tripped due to overcurrent.Which of the following actions would raise CC system pressure?
#9. Given:- A Unit 1 manual reactor trip was initiated due to a RCS leak inside containment.- The following indications are present on 1PM05J:- Reactor Trip Breakers (RTA and RTB) green indicating lights are LIT.- Reactor Trip Breakers (RTA and RTB) red indicating lights are NOT LIT.Which of the following describes the current status of the components associated with eachReactor Trip Breaker? (Assume RTA AND RTB are NOT mechanically bound)Each reactor trip breaker circuit has
#10. Given:- Unit 2 was at 100% power, all systems normally aligned.- A large steam break occurred outside containment, downstream of the MSIVs.- A manual reactor trip and MS isolation were actuated.- All systems functioned as designed.Based on the above conditions, the ES Non-Return Check Valves
#11. Given:- Unit 1 was at 100% power.- Unit 2 is defueled.- Unit 1 reactor was manually tripped due to lowering SG NR levels.- Operators are verifying AF system alignment in step 15 of 1BwEP-0, REACTORTRIP OR SAFETY INJECTION, with the following indications: – 1A AF pump is OOS. – 1B AF pump is running with 760 gpm discharge flow. – Annunciator 1-3-A7, AF Pump Suction Pressure Low, is in alarm. – Annunciator 1-3-E7, AF Pump SX Suction Valves Armed, is in alarm.
#12. Given:- Unit 1 is in mode 6, core off load is in progress.- A loss of off-site power occurs.- All systems function as designed.Tech Specs require the Unit 1 operators to
#13. Given:- A loss of Instrument Bus 114 has occurred.- Operators have locally isolated instrument air to 1AF005E-H, AF Flow ControlValves.- 1AF013A-H, AF Isolation Valves, are open.- A reactor trip occurred and AF has actuated.1B train AF flow can be controlled by
#14. Given:- Unit 1 is at 50% power, all systems normally aligned.- Annunciator 1-21-E10, 125 VDC Distribution Panel 111/113 Volt Low, is in alarm.Which of the following would indicate ONLY 125 VDC Bus 113 is de-energized?
#15. Given:- Unit 1 was at 100% power.- All systems normally aligned.- A reactor trip occurred on Unit 1 and transition to 1BwEP ES-0.1, REACTORTRIP RESPONSE, has been made.- 1B SX pump has TRIPPED.- Annunciator 1-2-A2, SX Pump Discharge Header Pressure Low, is in alarm.- 1BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION, has beenentered with the following conditions:- 1A SX pump was started.- Annunciator 1-2-C2, SX Strainer DP High, is in alarm.- Annunciator 1-2-A2 remained in alarm.- 1A SX pump inboard and outboard bearing temps are 150F and rising at2F/min.- 1A AF pump is running, all bearing temps are 133F and rising at4F/min.- 1B AF pump is running, all bearing temps are 135F and rising at3F/min.- 1A CV pump is running, all bearing temps are 178F and rising at3F/min, gear drive oil temperature is 154F and rising at 1.5F/min.- 1B CV pump is in standby.If ALL trends continue, which of the following pumps will be the FIRST to exceed its vitalequipment temperature limit?(1BwOA PRI-8, step 3 and 1BwOA PRI-8 table A are attached)
#16. When performing 1BwCA-1.2, LOCA OUTSIDE CONTAINMENT, why are RH componentsisolated BEFORE other ECCS components?
#17. Given:- Unit 1 was at 100% power, all systems normally aligned.- A large break RCS LOCA occurred.- While performing 1BwEP ES-1.3, TRANSFER TO COLD LEGRECIRCULATION, 1SI8811A AND 1SI8811B, Containment Sump IsolationValves, failed to open.- The operating crew has implemented 1BwCA-1.1, LOSS OF EMERGENCYCOOLANT RECIRCULATION.Under these conditions, which of the following states the reason 1BwCA-1.1 directs establishingonly one train of SI flow?
#18. Given:- Unit 1 was at 100% power.- A loss of heat sink has occurred.- NO CV pumps are available.- The operating crew is establishing RCS ‘Bleed and Feed’ in accordance with1BwFR-H.1, LOSS OF SECONDARY HEAT SINK.- After all methods to establish a bleed path are attempted, ONLY ONE PZRPORV is open.Which of the following describes the INITIAL consequence of having only one PZR PORVopen?
#19. Given:- Unit 1 is at 90% power.- All systems are normally aligned.- A power ramp to 100% power at 0.2 MW/min is in progress.- Annunciator 1-10-E6, Rod At Bottom, alarms with the following conditions: – DRPI for rods H-4 and D-8 indicates 0 steps. – Control rods are withdrawing in automatic. – Tave is lowering rapidly.Based on the above indications, the reactor operator is required to
#20. Given:- Unit 2 is at 30% power.- All systems are normally aligned.- Annunciator 2-10-C6, Rod Control Urgent Failure, alarms due to a failure in theRD logic cabinet.- An automatic reactor trip signal occurs due to a loss of feedwater.- The reactor does NOT trip.- A manual reactor trip was unsuccessful.- Operators enter 2BwFR-S.1, RESPONSE TO NUCLEAR GENERATION/ATWS,with the following conditions:- RTA and RTB are closed.- Reactor power is 28.5%.- The turbine is tripped.- AF pumps are running.- Steam dumps are isolated.- Emergency boration is in progress via 2CV8104, Emergency BorationValve, and 2A CV pump.Which of the following verifies negative reactivity is being inserted from the boration?
#21. Given:- Unit 1 is at 100% power.- An alarm sounds on the RM-11 and the following indications are noted:- The GRID 1 display for 1PR03J, 1B/1D RCFC SX Outlet RadiationMonitor, is DARK BLUE.- No other cursors are lit on the STATUS DISPLAY for 1PR03J.Based on the above indications, the NSO should inform the Unit Supervisor that 1PR03J
#22. Given:- The Fuel Handling Building Ventilation system is aligned for standby operation.0VA04CA – 0A Fuel Handling Building Charcoal Booster Fan.0VA060Y – 0A Fuel Handling Building Charcoal Absorber Inlet Isolation Damper.0VA051Y – 0A Fuel Handling Building Charcoal Absorber Bypass Isolation Damper.Which of the following describes the response associated with the Fuel Handling BuildingVentilation System upon receipt of a Fuel Handling Building HIGH radiation alarm on0RT-AR055, Train A Fuel Handling Incident Monitor?
#23. Given:- Unit 1 was at 100% power.- 1A AF pump is OOS.- A fire occurred in the AEER.- The crew entered 0/1BwOA PRI-5, CONTROL ROOM INACCESSIBILITY, andtripped the reactor.- When the low-2 SG NR level was reached, the 1B AF automatically started.- The 1B AF pump tripped shortly after starting due to low-3 suction pressurecaused by fire damage to the AF pump suction pressure circuitry.Based on the above conditions, the 1B AF pump will be started
#24. Given:- A small break RCS LOCA has occurred on Unit 1.- Conditions have deteriorated and the crew has implemented 1BwFR-C.2,RESPONSE TO DEGRADED CORE COOLING.- The crew is depressurizing all intact SGs to 90 psig.- If a red path condition arises on the integrity status tree, the crew is directed tocomplete 1BwFR-C.2 prior to implementing 1BwFR-P.1, RESPONSE TOIMMINENT PRESSURIZED THERMAL SHOCK.Why is the crew directed to complete 1BwFR-C.2 prior to implementing 1BwFR-P.1?
#25. Given:- A Unit 1 core reload is in progress.- The containment Fuel Handling Supervisor reports a twice burned fuel assemblyfell from the refueling machine into the core and burst.- 1AR011 and 1AR012, Containment Fuel Handling Incident Monitors, are in highalarm and rising rapidly.Per 1BwOA REFUEL-1, FUEL HANDLING EMERGENCY, the operators FIRST action is to
#26. Given:- Unit 1 was at 100% power.- All systems are normally aligned.- A small break RCS LOCA occurred.- The crew is performing 1BwEP ES-1.2, POST LOCA COOLDOWN ANDDEPRESSURIZATION.- BOTH SI pumps are running.- RCS pressure is stable.- The crew has determined that RCS subcooling is adequate to secure ONE SIpump.When one SI pump is stopped, RCS subcooling will
#27. Given:- Unit 1 is performing a natural circulation cooldown per 1BwEP ES-0.2,NATURAL CIRCULATION COOLDOWN.- RCS temperature is 500F.- RCS pressure is 1875 psig.- ALL CRDM exhaust and booster fans are tripped and CANNOT be restarted.- RVLIS train A head AND plenum levels indicate 100%.- RVLIS train B is de-energized.Continuing the RCS cooldown and depressurization under these conditions will require
#28. Given:- Unit 2 is at 100% power.- All systems are normally aligned for the current power level.Which transformer provides power to the 2A Reactor Coolant Pump?
#29. Given:- Unit 1 is at 100% power.- All systems normally aligned.- Annunciator 1-7-C3, RCP Seal Leakoff Flow Low, is in alarm.With no operator action, which of the parameters listed below would be indicative of a failedseal leakoff instrument for the affected RCP?
#30. Given:- Unit 2 is in Mode 5.- The pressurizer is solid.- RCS pressure is 350 psig and stable.- RH letdown is in service.- Normal charging is in service.If instrument bus 214 is de-energized, with NO operator action over the next 10 minutes, RCSpressure will
#31. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- An extra NSO is performing 1BwOSR 3.5.5.1, RCS Seal Injection FlowSurveillance, with the following indications:- Average PZR pressure is 2235 psig.- Charging header pressure is 2360 psig.- 1CV182, Charging Header Back Pressure Control Valve, demand is at100%.- 1A RCP seal injection flow is 11.8 gpm.- 1B RCP seal injection flow is 12.7 gpm.- 1C RCP seal injection flow is 12.5 gpm.- 1D RCP seal injection flow is 12.0 gpm.Based on the above indications, RCP seal injection flow is(1BwOSR 3.5.5.1, Attachment A, is attached)
#32. Given:- Unit 1 is in Mode 4.- ALL RCS cold leg temperatures are 340F.- RCS boron concentration is 1590 ppm.- RCS pressure is 345 psig.- 1A RH train is aligned for cold leg injection.- 1B RH train is being aligned for shutdown cooling.- 1B RH train boron concentration is 1250 ppmPlacing the 1B RH train is service, with NO additional operator action, would cause
#33. Given:- Unit 2 is in Mode 5.- All systems are properly aligned.- Unit 2 is in reduced inventory condition (reactor vessel level is 396.5′).- 2A RH pump is in shutdown cooling.- A 200 gpm leak develops in the RCS inside containment.With no operator action, which of the indications below would be observed in the MCR?
#34. Given:- A large break RCS LOCA occurred on Unit 1.- RWST level is 32%.- 1CV8110, CV Pump Miniflow Isolation Valve, is closed.- No SI actuations/signals have been reset.If the NSO momentarily places the control switch for 1CV8110 to OPEN, 1CV8110 will(20E-1-4030CV16 is attached)
#35. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- Annunciator 1-12-B7, PRT Pressure High, is in alarm.- 1PI-469, PRT pressure, is 7 psig and slowly rising.- 1LI-470, PRT level, is 66% and slowly rising.- 1RE1003, RCDT Pumps Discharge Containment Isolation Valve, is open at1PM11J.Based on the above indications, the FIRST action that will restore PRT pressure is
#36. Given:- Unit 1 is at 100% power.- All systems normally aligned.- A LARGE BREAK RCS LOCA occurred inside containment.- Containment Spray and Phase B have actuated.- All systems respond as designed.The RCPs must be tripped to
#37. During steady state operation, pressurizer spray bypass flow provides adequate flow to
#38. Given:- Unit 2 is at 50% power.- All systems are normally aligned.- The temperature portion of the loop B Over-temperature Delta T calculator hasjust failed as is.If Unit 2 power is increased to 100% while maintaining PZR pressure at program value andAFD on target, what will be the plant response?
#39. What is the purpose of the Overpower Delta T reactor trip?
#40. Given:- Unit 1 was at 100% power.- The following sequence of events occurred:- IMD was performing a surveillance calibration on PZR pressure channel1PT-458 when PZR pressure channel 1PT-455 spiked low, resulting in anSI.- The reactor tripped, however, Reactor Trip Breaker A did NOT open andCANNOT be opened locally.- The SI signal is NO longer present.- Both Train A and Train B SI Reset pushbuttons have been depressed.- The following indications are present on 1PM05J Bypass Permissive Panel:- 1-BP-4.1, SI ACTUATED is NOT LIT.- 1-BP-5.1, AUTO SI BLOCKED is FAST FLASHING.- Normal Charging and Letdown have been restored.- All ECCS equipment has been restored to its normal alignment.Then a 450 gpm SGTR occurs. With NO further operator action, which of the followingindicates the effect on the RCS over the next ONE HOUR time period?
#41. Given:- A reactor trip and safety injection have occurred on Unit 1.- While performing step 7 of 1BwEP-0, REACTOR TRIP OR SAFETYINJECTION, an NSO reports the Group 2 RCFC Accident Mode lights for 1A and1C RCFCs are dark.Which of the following indications would explain the failure of the 1A and 1C RCFC AccidentMode lights to illuminate?
#42. Given:- Unit 2 is at 100% power.- All systems are normally aligned.- Annunciator 2-2-E4, CC Surge Tank Auto M/U On, is in alarm.- CC Surge Tank level is 38% and lowering at 0.5% per minute.Based on the above indications, the FIRST action the operators will perform is to :
#43. Given: – A large break RCS LOCA occurred on Unit 2.- Operators are preparing to align CS for recirculation per 2BwEP ES-1.3,TRANSFER TO COLD LEG RECIRCULATION, with the following conditions:- Train A ECCS has been aligned for cold leg recirculation.- ALL CV, SI, and CS pumps are running.- 2A RH pump is running.- 2B RH pump is in pull out.- 2SI8812B, RH Pump 2B Suction From RWST Isolation Valve, is closed.- 2SI8811B, Cnmt Sump 2B Isolation Valve, is closed and CANNOT beopened from the MCR.- 2CS001B, CS Pump 2B RWST Suction Valve, is open.- 2CS009B, CS Pump 2B Sump Suction Valve, is closed.- RWST level is 7%.Based on the above indications, the operators will
#44. Given:- Unit 2 is in Mode 3, RCS cooldown is in progress per 2BwGP 100-5, PLANTSHUTDOWN AND COOLDOWN.- RCS pressure is 1650 psig.- RCS temperature is 505F.- ALL SG pressures are 690 psig.- CNMT pressure is 0.4 psig.- BOTH steamline isolation SI block bypass permissive lights are lit.At time = 0 seconds a steamline break occurs inside containment.At time = 10 seconds the following indications are noted:- RCS pressure is 1600 psig.- RCS temperature is 495F.- ALL SG pressures are 665 psig.- Containment pressure is 0.9 psig.If current trends continue, the MSIVs will BEGIN closing at approximately time =
#45. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- BOTH turbine driven feedwater pumps are in auto.- The Master FW Pump Speed Controller is in auto.- 1B FW Pump LP Governor Valve fails closed over a one minute period.Based on the above conditions, which of the following indications will be present on 1PM04J forthe 1B FW Pump TWO minutes later? (Assume no operator action)
#46. Given:- Unit 1 is at 100% power.- 1A FW pump is OOS for bearing replacement.- 1B FW pump develops a severe vibration and subsequently trips.- The crew implements 1BwOA SEC-1, SECONDARY PUMP TRIP.After the crew stabilizes the plant and exits 1BwOA SEC-1, the maximum power level allowedon Unit 1 will be(assume PDMS remains operable throughout event)
#47. Given:- Unit 1 is at 100% power.- A SAT fault causes a loss of offsite power.- Bus 159 does not ABT to the UAT and a reactor trip occurs.- BOTH DGs start and energize their respective ESF buses.- Bus 143 and 144 are deenergized.- BOTH AF pumps are running.- Steam dumps are in STM PRESS mode.- SG NR levels are 14% and slowly rising.- PZR pressure is 1950 psig and slowly lowering.- RCS Tave is 554F and slowly lowering.Which of the following MCR actions will reduce the likelihood of a PZR low pressure SIoccurring?
#48. Given:- Unit 1 is at 100% power.- Unit 2 is in Mode 3, preparing for a reactor startup.- All equipment is properly aligned.- A fault occurs on SAT 242-2.- The crew enters 2BwOA ELEC-4, LOSS OF OFFSITE POWER.In accordance with 2BwOA ELEC-4, which of the following loads will be aligned to the 2A DGwhen required to support plant operation?
#49. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- An undervoltage condition occurs on bus 141.- The 1A DG starts.- 15 seconds after the bus undervoltage, 125 VDC Bus 111 is deenergized.Once the 1A DG receives a start signal, the 1A DG will
#50. Given:- BOTH Units are at 100% power.- All systems are normally aligned.- 1A and 2B SX pumps are running.- A fault occurs on bus 142, causing a loss of bus 142.- 1B DG starts, but ACB 1423 does NOT close due to the bus fault.The 1B DG.
#51. Given:- BOTH Units are at 100% power.- All systems are normally aligned.- Unit 0 CC Hx is aligned to Unit 1.- 0/1/2PR09J, Unit 0/1/2 CC Hx SX Outlet Rad Monitors, are indicating 5.45E-07.- 0/1/2PR09J have the following channel item settings:- 009 SETPOINT, HIGH ALARM = 1.89E-05.- 010 SETPOINT, ALERT ALARM = 9.45E-06.- 0PR09J detector output fails to 3.00E-03.- 1/2PR09J indications have NOT changed.- 1/2CC017, Unit 1/2 CC Surge Tank Vent Valves, are open.Based on the above indications, the operators will…
#52. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- 0A VC Train is running.- A reactor trip and safety injection occur.- All equipment functions as designed.- The crew implements 1BwEP-0, REACTOR TRIP OR SAFETY INJECTION.- While verifying control room ventilation properly aligned, an NSO discovers thefollowing conditions:- 0PR31J, 0A Train Control Room Outside Air Intake Radiation Monitor,cursors are RED.- Main control room pressure is 0.165″ H2O.Based on the above information, the NSO will
#53. Given:- Unit 2 is in Mode 5.- The RCS is solid.- 2A RH Pump is running in shutdown cooling mode.- 2A AND 0 CC Pumps are running.- 2CV131, Letdown Line Pressure Controller, is in AUTO.- BOTH PZR PORVs are in ARM LOW TEMP.If 2SX007, Unit 2 CC Hx SX Outlet Valve, failed closed, which of the following would occurFIRST?
#54. Given:- BOTH Units are at 100% power.- All systems are normally aligned.- Unit 2 station air compressor (SAC) is supplying ALL instrument and service airloads.- The remaining two SACs are in standby.- A four inch diameter turbine building SERVICE AIR header ruptures.Which of the following describes the plant response?
#55. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- Annunciator 1-5-B7, CNMT Phase A Isolation, alarms.- SER point 0017, CNMT Phase A Isolation Train A, is printed.Which of the status lights listed below would be LIT as a DIRECT result of the Phase A signal?
#56. Given:- Unit 2 is at 100% power.- All systems are normally aligned.- PZR level control selector switch is in 459/461 position.- A reference leg leak develops in PZR level transmitter 2LT-459.- No ESF actuations occur as a result of the reference leg leak.With no operator action, VCT level will
#57. Given:- Unit 1 experienced a large break RCS LOCA.- The operators have transitioned to 1BwEP ES-1.3, TRANSFER TO COLD LEGRECIRCULATION, and are currently aligning RH pump suctions to thecontainment sumps per step 3.- Both SR channels are energized.- Core downcomer voiding is occurring.- The STA reports a YELLOW path on the subcriticality status tree with an endpath of 1BwFR-S.2, RESPONSE TO LOSS OF CORE SHUTDOWN.Which of the following statements describes the IMMEDIATE result that voiding in thedowncomer region would have on the Source Range instrumentation and the procedure used tomitigate these plant conditions?
#58. Inadvertent draining of the spent fuel pool is prevented by . . .
#59. A loss of power to 0AR039J, Fuel Handling Building Crane Radiation Monitor, will prevent . . .
#60. Given:- Unit 1 is at 4% power.- All systems are properly aligned for the current power level.- 1PI-507, MS Header Pressure, is indicating 1092 psig.- 1PK-507, MS Header Pressure Controller, is in Auto with a potentiometer settingof 7.28.- 1PK-507 demand is 16%.- 1UI-500, Steam Dump Demand, is 16%.If the 1PK-507 potentiometer setting is raised to 7.4, what will be the INITIAL plant response?
#61. Which of the following components is operated at 0OG01J, Off Gas Local Control Panel?
#62. While performing 0BwOSR 0.1-0, UNIT COMMON ALL MODES/AT ALL TIMES SHIFTLY ANDDAILY OPERATING SURVEILLANCE, the following readings are recorded:- 0AT-GW8000, hydrogen analyzer = 4.8%.- 0AIT-GW8003, oxygen analyzer = 6.1%.- 0AIT-GW004, GW compressor discharge oxygen analyzer = 1.8%.What actions, if any, are required?
#63. Given:- Unit 1 is at 100% power.- Loop 1C NR Thot instrument channel is failed as is.- A reactor trip occurs.- 1A reactor trip breaker (RTA) remains closed and CANNOT be opened.Based on the above indications, RCS temperature will be maintained at
#64. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- 1A SX pump is running, 1B SX pump is in standby.- A loss of DC bus 112 occurs.- The operating crew manually trips the reactor.- One minute after the reactor trip, an SI occurs.- Ten seconds have elapsed since the SI actuation.Based on the above conditions, the 1B SX pump
#65. During a surveillance run of the 1A MOTOR DRIVEN Auxiliary Feedwater Pump, the followingconditions are noted:- The NLO at the scene reports electrical arcs and flames coming from the 1A AFpump motor housing.- The 1A AF pump breaker has tripped open.Which of the fire protections subsystems listed below will be used to extinguish the fire in the1A AF pump motor?
#66. An NSO has been off for the past seven days and is preparing for turnover on Unit 2. Beforethe oncoming NSO can assume the duties of the Unit 2 NSO, the oncoming NSO must reviewthe control room logs back through
#67. Which of the following statements correctly describes the green board concept of operatingmain control panesl?Green indicates a
#68. Given:- A plant transient occurred requiring implementation of emergency procedures.- An NSO has been directed to start a component using a BwOP as directed in theemergency procedure in progress.- A limitation and action in the BwOP CANNOT be verified due to current plantconditions.Based on the above information, the
#69. Given:BOTH Unit 1 and Unit 2 are at 100% power, MOL.Condition 1:A large break RCS LOCA occurs on BOTH Units.Condition 2:A large steamline break occurs on BOTH Units.Which of the following correctly describes the response of both Units’ containment pressure tothe conditions listed above?
#70. Concerning Unit differences in the MCR, which of the following controls/indications are locatedONLY on the Unit 1 main control boards?
#71. Given:- A male radiation worker at Braidwood Station returned 3 weeks ago from outagesupport at LaSalle Station.- His Total Effective Dose Equivalent (TEDE) received at LaSalle was 150 mrem.- As a result of an injury, the worker had an ankle x-ray one week ago estimatedat 10 mrem exposure to the ankle.- The worker’s current TEDE from Braidwood for this year is 75 mrem.Based on the above information, what is the calculated MAXIMUM annual non-emergencyTEDE that he can receive at Braidwood for the remainder of this year without exceeding theFederal Exposure Limits?
#72. Given:- A Unit 1 Containment Release package is in progress per BwRP 6110-13T1,CONTAINMENT RELEASE FORM.While performing the release package, ALL of the following are an NSO responsibilityEXCEPT
#73. Given:- A Gas Decay Tank (GDT) in storage has been determined to contain greaterthan 50,000 Curies activity.Which of the following correctly describes the method of lowering the affected GDT activity per0BwOA RAD-3, DECAY TANK HIGH ACTIVITY?
#74. Given:- A major plant transient is in progress and numerous MCR annunciators arealarming.- Plant conditions are rapidly deteriorating.Which of the following describes the requirement for annunciator response during this transientper OP-AA-103-102, WATCHSTANDING PRACTICES.
#75. Given:- Unit 2 was at 100% power.- All systems are normally aligned.- An ATWS occurred concurrent with a loss of heat sink.- The SM determined the INITIAL classification of the event is a GeneralEmergency.- The SM instructs the Unit 1 assist NSO to perform state/local notifications.The preferred method of contacting state/local authorities will be the
#76. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- PZR pressure channel 1PT-456 fails high.- The following indications exist on 1PM05J.- 1PI-455 is 2190 psig.- 1PI-456 is 2500 psig.- 1PI-457 is 2192 psig.- 1PI-458 is 2191 psig.- PZR PORV 1RY-455A is closed.- PZR PORV 1RY-456 is open.Based on the above indications, which of the following Tech Specs must be entered?
#77. Given:- BOTH Units are at 100% power.- All systems normally aligned.- BOTH Unit 1/2PR30J, Wide Range Gas Monitors, are inoperable.- A Unit 2 SGTR occurred.- Unit 2 operators manually tripped the Unit 2 reactor and actuated safetyinjection.- Unit 2 operators have initiated a cooldown with the steam dumps per 2BwEP-3,STEAM GENERATOR TUBE RUPTURE, with the following indications:- VA019/020, Unit 1/2 Vent Stack Effluent Flow, are inoperable.- 0VA01JA and 0VA01JC flow indicators are inoperable.- 0VA01CA, 0A Aux Building Supply Fan, is running.- 0VA02CA, 0A Aux Building Exhaust Fan, is running.- 0VL02CB, 0B Lab Exhaust Fan, is running.- 0VW03CB, 0B Service Building and Solid Radwaste Fan, is running.- 0VF01CA, 0A Aux Building Filtered Vents Fan, is running.- 1PB128 is reading 4.15 E-07 microCi/cc.- 1PD428 is reading 1.20 E-03 microCi/cc.- 2PB128 is reading 4.15 E-07 microCi/cc.- 2PD428 is reading 5.25 E-02 microCi/cc.Using the attached copies of BwZP 200-3 and BwZP 200-3A1, calculate the station totalrelease rate.The station total release rate is
#78. Given:- Unit 1 was at 100% power.- All systems are normally aligned.- A reactor trip and SI have occurred due to a steam break.- ALL MSIVs failed to close.- 1BwCA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL S/Gs, is inprogress at step 5 with the following conditions:- AF flow rate is 45 gpm per SG due to required operator action.- ALL SG NR levels are 6%.- CNMT pressure has remained below 2 psig.- RCS pressure is 1350 psig.- High head SI flow (1FI-917) is 500 gpm.- CETCs are 495F and RISING.- ALL RCPs are running.The STA has just informed the Unit Supervisor that a RED path condition exists on the HeatSink status tree. Based on the above indications, the crew will
#79. Given:- Unit 2 experienced a loss of all AC power.- The crew has implemented 2BwCA-0.0, LOSS OF ALL AC POWER.- The crew is unable to crosstie either Unit 2 4KV ESF bus to a Unit 1 4KV ESFbus.- The crew is performing 2BwCA-0.0, attachment B step 20 with the followingconditions: – Non-vital DC and AC instrument loads have been shed.- DC Bus 211 voltage is 105V.- DC Bus 211 current is 1200A.- DC Bus 212 voltage is 125V.- DC Bus 212 current is 100A.- DC Bus 111 voltage is 131V.- DC Bus 111 current is 8A.- DC Bus 112 voltage is 130.5V.- DC Bus 112 current is 10A.Based on the above indications, the Unit Supervisor will direct the crew to…(2BwCA-0.0, BwOP DC-2T1-211, BwOP DC-2T1-212, BwOP DC-7-211 and BwOP DC-7 212are attached.)
#80. Given:- A large break RCS LOCA occurred on Unit 1- The SM has declared a SITE AREA EMERGENCY due to a loss of fissionproduct barriers.Based on the above conditions, the SM will notify personnel to staff which of the following EROfacilities?
#81. Given:- Unit 1 was at 50% power.- 1A AF pump has been OOS for the last 58 hours.- Two hours, ago a reactor trip occurred.- 1B AF pump tripped shortly after starting due to a faulty speed sensor and couldNOT be restarted.- The crew entered 1BwEP-0, REACTOR TRIP OR SI, and transitioned to 1BwEPES-0.1, REACTOR TRIP RESPONSE.- While performing 1BwEP ES-0.1, a red path was encountered on the heat sinkstatus tree.- The crew transitioned to 1BwFR-H.1, LOSS OF SECONDARY HEAT SINK,tripped the RCPs and established FW flow with the startup FW pump.- SG NR levels were restored and 1BwFR-H.1 was exited.- RCS Tave is currently 557F.What actions are required by Tech Specs?
#82. Given:- Unit 1 is at 8% power.- Annunciator 1-10-B2, IR HI VOLT FAILURE, is lit.- IR channel N-35 reads 2 x 10 -5 amps.- IR channel N-36 reads 1 x 10 -11 amps.Based on the above indications, one of the Tech Spec required actions and the reason for thataction is to
#83. Given:- Unit 1 is at 100% power.- All systems are normally aligned.- Condenser vacuum begins degrading rapidly.- The crew enters 1BwOA SEC-3, LOSS OF CONDENSER VACUUM, andinitiates a manual reactor trip.- All attempts to trip the reactor from the MCR fail.- The Shift Manager has declared a SITE AREA EMERGENCY.Based on the above information, the Shift Emergency Director must notify the state authoritieswithin 15 minutes
#84. Given:- BOTH Units are at 100% power.For which of the following events or conditions must the Plant Manager be notified inaccordance with OP-AA-106-101, SIGNIFICANT EVENT REPORTING?(OP-AA-106-101 is attached)
#85. Given:- 1BwEP ES-0.3, NATURAL CIRCULATION COOLDOWN WITH STEAM VOID INVESSEL (WITH RVLIS), is in progress at step 2 with the following conditions:- Iconics subcooling indicates 0F.- RCS pressure is 1400 psig and stable.- CETCs are 590F and rising slowly.- PZR level is 36% and stable.- RVLIS plenum level is 100%.- RVLIS head level is 31%.- Containment pressure is 0.3 psig.- Normal charging and letdown are in service.- Bus 143 and 144 are energized and the main condenser is available.- Buses 156 – 159 are energized.- Conditions for starting RCPs have been established per 1BwOA ESP-1, RCPSTARTUP DURING ABNORMAL CONDITIONS.Based on the above conditions, the Unit Supervisor will direct the crew to(1BwEP ES-0.3 is attached)
#86. Given:- Unit 1 is at 20% power.- All systems are normally aligned.- PZR pressure is 2205 psig and lowering.- 1RY455C, PZR Spray Valve, is open and cannot be operated in manual ORauto.- All other PZR system components are operating as designed.Based on the above indications, the Unit Supervisor will direct the crew to
#87. Given:- Unit 1 is at 85% power.- All systems are normally aligned.- An EH leak develops in the turbine building.- The 1B FW pump trips due to the EH leak.- Prior to any operator action being taken, the EH leak causes the 1C FW pump totrip.The Unit Supervisor will direct the crew to.
#88. Given:- Both Units are at 100% powerSource #1 – 345 KV system to buses 141 & 142 from Unit 1 SATs.Source #2 – 345 KV system to buses 141 & 142 from Unit 2 SATs via crosstie.Source #3 – BOTH Unit 1 DGs.Which combination of the AC sources listed above satisfies the requirements of LCO 3.8.1 – ACSources – Operating for Unit 1?
#89. Given:- Unit 1 is in Mode 6.- During performance of 1BwOSR 3.8.1.10-1, 1A DG FULL LOAD REJECTIONAND SIMULATED SI IN CONJUNCTION WITH UV DURING LOAD TEST, thefollowing occurred:- 1A DG was manually started.- A manual SI signal was actuated.- ACB 1412, SAT 142-1 Feed to 4 KV Bus 141, was manually opened.- ACB 1413, DG Feed to 4 KV Bus 141, automatically closed.- The following components start times were noted:- 1A CV Pump 0 seconds- 0A VC Chiller 0 seconds- 1A SI Pump 5 seconds- 1A CC Pump 20 seconds- 1A SX Pump 25 seconds- 1A AF Pump 35 seconds- 1A CS Pump did NOT start.Based on the above indications
#90. Given:- Unit 1 is at 33% power and stable.- RCS Tave is 566F and stable.- Turbine power is 30% and stable.- PZR level is 20% and lowering.- PZR pressure is 2150 psig and lowering.- Containment pressure is 2 psig and rising.If containment pressure continues to rise to the CS actuation setpoint, the CS pumps may besecured
#91. Given:- The Unit 1 assist NSO has just completed the operability check of the Unit 1Incore Temperature Monitoring System (CETCs) with the following results:- Train A has 19 operable CETCs.- Train B has 21 operable CETCs.- Quadrant 1 has 3 of 15 CETCs operable.- Quadrant 2 has 10 of 12 CETCs operable.- Quadrant 3 has 12 of 15 CETCs operable.- Quadrant 4 has 15 of 17 CETCs operable.Based on the above indications, the Unit Supervisor will(LCO 3.3.3, TLCO 3.3.h, and TLCO 3.3.i are attached)
#92. Given:- Unit 1 is in Mode 6.- A fuel load is in progress following a complete core off load.Which of the following conditions require an IMMEDIATE suspension of core alterations?
#93. – Unit 1 is at 90% power.- All systems are normally aligned.- Chemistry has just notified the MCR that secondary chemistry is abnormal due toa condenser tube leak.- SG sodium is exceeding the Action Level 3 limit.Given the above information, how should the crew proceed?
#94. Given:- BOTH Units are at 100% power.- All systems are normally aligned.- 0BwOA ELEC-1, ABNORMAL GRID CONDITIONS, was entered as the result ofa state estimator alarm due to a predicted condition if BRAIDWOOD UNIT 2tripped.- The state estimator predicted voltage is 344.4 KV for both units.- The following indication exist:- Bus 143 voltage is 4350 volts.- Bus 143 current is 700 amps.- Bus 144 voltage is 4300 volts.- Bus 144 current is 635 amps.- Bus 243 voltage is 4280 volts.- Bus 243 current is 845 amps.- Bus 244 voltage is 4300 volts.- Bus 244 current is 700 amps.Based on the above conditions, the crew will…(0BwOA ELEC-1 is attached)
#95. Given:- A Temporary Change is being performed for a BwOP per AD-AA-101,PROCESSING OF PROCEDURES AND T&RMs.The Temporary Change
#96. Which of the following activities is considered production risk per WC-AA-104, REVIEW ANDSCREENING FOR PRODUCTION RISK?(WC-AA-104 and station production risk matrix is attached)
#97. Given:- BOTH Units are at 100% power.- A release package has been requested for 0F GDT.- 0PR02J, Gas Decay Tank Effluent Monitor, was declared inoperable last shift.- All required TS/TRM/RETS have been entered.The release (0BwOS RETS 2.2-1a is attached)
#98. Given:- Unit 1 has experienced an event requiring Emergency Plan implementation.- Personnel are preparing to enter Unit 1 curved wall area (CWA) to rescue aninjured worker.- The rescuers are expected to receive 10 Rem exposure during the rescue.Which of the individuals listed below must authorize the emergency exposure?
#99. Given:- Unit 1 is in Mode 5, preparing for a fuel off-load.- Unit 1 has been shutdown for 7 days.- ALL loops are isolated.- 1B RH pump is operating in shutdown cooling when the following occurs:- The 1B RH pump trips.- 1A RH pump will NOT start.- The crew enters 1BwOA PRI-10, LOSS OF RH COOLING and initiates bleedand feed per Attachment C.- The crew is preparing to commence makeup flow to the RCS per 1BwOAPRI-10, Attachment C, step 7 with the following conditions:- BOTH PZR PORVs are open.- CETCs are 130F.- RVLIS is 100% on both trains’ head and plenum.- RCS pressure is 90 psig.- RWST level is 91%.Based on the above indications, the Unit Supervisor will direct the crew to establish a MINIMUMRCS makeup flow of(1BwOA PRI-10 is attached)
#100. Given:- Unit 1 experienced a small break RCS LOCA with a total loss of ALL ECCSpumps.- EAL FG1 was declared 2 minutes ago.- 1BwFR-C.2, RESPONSE TO DEGRADED CORE COOLING, has been inprogress for the past 20 minutes.- The TSC is NOT staffed yet and offsite dose calculations are NOT available.- A controlled direct CNMT vent has NOT occurred.- No releases are occurring.- The CNMT is intact.- CNMT rad levels (1AR020/021) are 505 R/hr.- CNMT pressure is 12 psig.- CETC’s are 755F and have slowly risen over the past 20 minutes.- RVLIS plenum level is 0%.Based on current plant conditions, the results of determining the Protective ActionRecommendations (PARs) will be(EP-AA-111-F-02 and EP-AA-1001 are attached)